Every shop floor calculates OEE its own way
OEE, availability and performance are defined in the semantic layer, so every workshop and every report uses the same formula.
Solutions by industry
Plant managers and supervisors need one shared picture of output, scrap, downtime and unit cost. The Manufacturing pack ships with OEE (availability × performance × quality), first-pass yield, downtime minutes and average cost per good unit.
Free plan with no time limit · No card required · Sample workspace ready in minutes
OEE, availability and performance are defined in the semantic layer, so every workshop and every report uses the same formula.
Unplanned downtime minutes by machine, shift and reason show where you lose the most capacity.
Scrap rate and first-pass yield by item, with an alert when they cross a threshold instead of waiting for the monthly report.
Cost per good unit and cost-to-output ratio connect production numbers with the accounting books.
Each team has its own metrics and dashboards on the same industry data.
Si answers with approved metrics, their source and confirmation level.
Tickets linked to manufactured items against good output, next to scrap rate, to see which items draw the most complaints.
Ticket volume, response and resolution speed, and customer satisfaction by channel and category.
Productivity, speed and quality of handling for each customer service agent and team.
Good output, output value and OEE broken into availability, performance and quality rate by workshop, machine and shift.
Definitions come from the analytics packs; Si, dashboards and reports use exactly these.
| Metric | Definition | Unit |
|---|---|---|
| OEE (overall equipment effectiveness) | Availability x performance x first pass yield, computed on the period totals.= (mfg_run_minutes / mfg_planned_minutes) * (Total output / mfg_ideal_output) * (Good output / Total output) | Ratio (%) |
| Availability | Run minutes divided by planned minutes. The first component of OEE.= mfg_run_minutes / mfg_planned_minutes | Ratio (%) |
| Performance | Total output divided by the ideal output for the run time. The second component of OEE.= Total output / mfg_ideal_output | Ratio (%) |
| First pass yield (FPY) | Good output divided by total output. The quality component of OEE.= Good output / Total output | Ratio (%) |
| Scrap rate | Scrap units (total output minus good output) divided by total output.= (Total output - Good output) / Total output | Ratio (%) |
| Downtime minutes | Total machine downtime minutes recorded in the period, for every reason (including changeovers and scheduled maintenance). | Number |
| On-time completion rate | Work orders completed on time divided by work orders completed in the period.= mfg_on_time_work_orders / Completed work orders | Ratio (%) |
| Good output | Good units (total output minus scrap) produced in the period's shifts, by shift date. | Count |
| Average cost per good unit | Production cost (accounts 621, 622, 627) for the period divided by good units (net of scrap) produced in the same period.= Production cost / Good output | Currency |
Yes. Combine the sheets following the template, one sheet per table with a column description; Si proposes the mapping into the manufacturing model.
Si breaks the change down by formula (availability, performance, quality) and by driving dimensions such as workshop or machine; every number comes with its definition.
Not necessarily. Refresh schedules, data tests and alerts run automatically; someone with the Admin role approves mapping changes.
Free plan with no time limit · No card required · Sample workspace ready in minutes