| Item-linked support tickets | Support tickets created in the period whose reference code matches a manufactured item (quality complaints, warranty, delivery about that item); can be broken down by item, item group and ticket category. | Count |
|---|
| Support tickets per 10,000 good units | Item-linked support tickets divided by good output in the same period, times 10,000. Shows how many tickets customers open about an item for every 10,000 units the plant produces; comparable between high- and low-volume items.= Item-linked support tickets * 10000 / Good output | Number |
|---|
| Call abandonment rate | Calls where the customer hung up before reaching an agent divided by all inbound calls.= cs_abandoned_calls / Inbound calls | Ratio (%) |
|---|
| Average first response time (hours) | Average hours from when the customer created a ticket to the agent's first response, over tickets created in the period that have a response.= cs_first_response_hours_total / cs_responded_tickets | Number |
|---|
| Average resolution time (hours) | Average hours from creation to resolution for tickets resolved in the period.= cs_resolution_hours_total / Resolved tickets | Number |
|---|
| Inbound calls | Calls into the call center in the period, including calls abandoned by the customer. | Count |
|---|
| CSAT (satisfaction rate) | Share of surveys with a CSAT score of 4 or 5 on a 1-5 scale, among surveys with a valid CSAT score.= cs_csat_positive / Survey responses | Ratio (%) |
|---|
| First contact resolution rate | Tickets resolved with a single contact and never reopened divided by tickets resolved in the period.= cs_fcr_tickets / Resolved tickets | Ratio (%) |
|---|
| NPS | Net Promoter Score = (promoters 9-10 minus detractors 0-6) x 100 / NPS responses. Scale -100 to 100.= cs_nps_points * 100 / cs_nps_responses | Number |
|---|
| Ticket reopen rate | Tickets resolved in the period that were ever reopened divided by tickets resolved in the period.= cs_reopened_tickets / Resolved tickets | Ratio (%) |
|---|
| Resolution rate | Tickets created in the period that are resolved divided by tickets created in the period.= cs_created_resolved / Support tickets | Ratio (%) |
|---|
| Resolved tickets | Tickets resolved in the period (by resolution date); status resolved or closed with a resolution timestamp. | Count |
|---|
| Survey responses | Post-support surveys with a valid CSAT score (1-5), by customer response date. | Count |
|---|
| Support tickets | Support tickets created in the period (by creation date), any status. | Count |
|---|
| Tickets per agent per day | Tickets created in the period divided by agent working days with tickets.= Support tickets / cs_agent_days | Number |
|---|
| Availability | Run minutes divided by planned minutes. The first component of OEE.= mfg_run_minutes / mfg_planned_minutes | Ratio (%) |
|---|
| Completed work orders | Work orders completed in the period, by completion date. | Count |
|---|
| Inspection defect rate | Defective samples divided by inspected samples across the inspection lots in the period.= mfg_defect_qty / mfg_inspected_qty | Ratio (%) |
|---|
| Downtime minutes | Total machine downtime minutes recorded in the period, for every reason (including changeovers and scheduled maintenance). | Number |
|---|
| First pass yield (FPY) | Good output divided by total output. The quality component of OEE.= Good output / Total output | Ratio (%) |
|---|
| OEE (overall equipment effectiveness) | Availability x performance x first pass yield, computed on the period totals.= (mfg_run_minutes / mfg_planned_minutes) * (Total output / mfg_ideal_output) * (Good output / Total output) | Ratio (%) |
|---|
| On-time completion rate | Work orders completed on time divided by work orders completed in the period.= mfg_on_time_work_orders / Completed work orders | Ratio (%) |
|---|
| Good output | Good units (total output minus scrap) produced in the period's shifts, by shift date. | Count |
|---|
| Output value | Good output multiplied by the item's standard selling price, by machine shift date. | Currency |
|---|
| Performance | Total output divided by the ideal output for the run time. The second component of OEE.= Total output / mfg_ideal_output | Ratio (%) |
|---|
| Total output | Total units produced in the period's shifts, including both good units and scrap. | Count |
|---|
| Scrap rate | Scrap units (total output minus good output) divided by total output.= (Total output - Good output) / Total output | Ratio (%) |
|---|
| Unplanned downtime share | Unplanned downtime minutes divided by total downtime minutes.= mfg_unplanned_downtime_minutes / Downtime minutes | Ratio (%) |
|---|