| Days of inventory (output value) | Average inventory divided by average daily output value. With daily inventory snapshots, this equals the sum of snapshot values divided by output value for the period. Shows how many days of production the material and finished goods inventory represents.= ops_inventory_value_total / Output value | Number |
|---|
| Material purchases to output ratio | Value of material purchase orders placed in the period divided by output value (at standard selling price) in the same period. A spike means buying more than production needs (building material stock); a sharp drop means drawing down inventory.= Purchase order value / Output value | Ratio (%) |
|---|
| Average inventory value | Average end-of-day inventory value in the period = sum of snapshot values divided by the number of days with a snapshot.= ops_inventory_value_total / ops_snapshot_days | Currency |
|---|
| Average supplier lead time (days) | Average days from order to receipt for purchase orders received in the period.= ops_lead_days_total / Received purchase orders | Number |
|---|
| Failed delivery rate | Failed or returned shipments divided by all outbound shipments in the period.= Failed shipments / Shipments | Ratio (%) |
|---|
| Failed shipments | Outbound shipments in the period that failed delivery or were returned to the warehouse. | Count |
|---|
| On-time delivery rate | On-time deliveries divided by all outbound shipments in the period (by ship date).= ops_on_time_deliveries / Shipments | Ratio (%) |
|---|
| Purchase orders | Purchase orders placed in the period (by order date), excluding cancelled orders. | Count |
|---|
| Purchase order value | Total ordered value (ordered quantity times unit price) of purchase orders placed in the period, excluding cancelled orders. | Currency |
|---|
| Received purchase orders | Purchase orders received in the period (by receipt date), including partial receipts. | Count |
|---|
| Received goods value | Total received quantity times unit price for purchase orders received in the period (by receipt date). | Currency |
|---|
| Shipments | Outbound shipments from the warehouse in the period (by ship date), any outcome. | Count |
|---|
| Stockout item-days | Inventory snapshots with zero (or negative) quantity in the period: each item out of stock at one warehouse on one day counts as 1. | Count |
|---|
| Supplier fill rate | Received value divided by ordered value of purchase orders received in the period. 100% means delivered in full; lower means the supplier short-shipped.= Received goods value / ops_closed_po_value | Ratio (%) |
|---|
| Supplier on-time rate | On-time PO receipts divided by received purchase orders in the period (by receipt date).= ops_on_time_receipts / Received purchase orders | Ratio (%) |
|---|
| Availability | Run minutes divided by planned minutes. The first component of OEE.= mfg_run_minutes / mfg_planned_minutes | Ratio (%) |
|---|
| Completed work orders | Work orders completed in the period, by completion date. | Count |
|---|
| Inspection defect rate | Defective samples divided by inspected samples across the inspection lots in the period.= mfg_defect_qty / mfg_inspected_qty | Ratio (%) |
|---|
| Downtime minutes | Total machine downtime minutes recorded in the period, for every reason (including changeovers and scheduled maintenance). | Number |
|---|
| First pass yield (FPY) | Good output divided by total output. The quality component of OEE.= Good output / Total output | Ratio (%) |
|---|
| OEE (overall equipment effectiveness) | Availability x performance x first pass yield, computed on the period totals.= (mfg_run_minutes / mfg_planned_minutes) * (Total output / mfg_ideal_output) * (Good output / Total output) | Ratio (%) |
|---|
| On-time completion rate | Work orders completed on time divided by work orders completed in the period.= mfg_on_time_work_orders / Completed work orders | Ratio (%) |
|---|
| Good output | Good units (total output minus scrap) produced in the period's shifts, by shift date. | Count |
|---|
| Output value | Good output multiplied by the item's standard selling price, by machine shift date. | Currency |
|---|
| Performance | Total output divided by the ideal output for the run time. The second component of OEE.= Total output / mfg_ideal_output | Ratio (%) |
|---|
| Total output | Total units produced in the period's shifts, including both good units and scrap. | Count |
|---|
| Scrap rate | Scrap units (total output minus good output) divided by total output.= (Total output - Good output) / Total output | Ratio (%) |
|---|
| Unplanned downtime share | Unplanned downtime minutes divided by total downtime minutes.= mfg_unplanned_downtime_minutes / Downtime minutes | Ratio (%) |
|---|