| Book-to-bill ratio | Value of contracts won in the period divided by output value (at standard selling price) in the same period. Above 1 means sales is booking more than the plant produces and the order backlog grows; below 1 means the plant will soon run short of work.= Won amount / Output value | Ratio (%) |
|---|
| Average deal size | Won amount divided by the number of won opportunities.= Won amount / Won opportunities | Currency |
|---|
| Average sales cycle (days) | Average days from creation to win for opportunities won in the period.= won_cycle_days_total / Won opportunities | Number |
|---|
| Lost opportunities | Number of opportunities lost, by close date. | Count |
|---|
| New opportunities | Sales opportunities created in the period (by creation date), including open, won and lost ones. | Count |
|---|
| Open pipeline value | Total value of opportunities created in the period that are still open (neither won nor lost). | Currency |
|---|
| Sales target | Total sales targets of sales reps. Targets are set monthly and recorded on the first day of the month. | Currency |
|---|
| Quota attainment | Won amount divided by sales target. Above 100% means the target is exceeded.= Won amount / Sales target | Ratio (%) |
|---|
| Win rate | Won opportunities divided by all closed opportunities (won plus lost) in the period. Open opportunities are excluded.= Won opportunities / (Won opportunities + Lost opportunities) | Ratio (%) |
|---|
| Won amount | Total value of won opportunities, by close date. | Currency |
|---|
| Won opportunities | Number of opportunities won, by close date. | Count |
|---|
| Availability | Run minutes divided by planned minutes. The first component of OEE.= mfg_run_minutes / mfg_planned_minutes | Ratio (%) |
|---|
| Completed work orders | Work orders completed in the period, by completion date. | Count |
|---|
| Inspection defect rate | Defective samples divided by inspected samples across the inspection lots in the period.= mfg_defect_qty / mfg_inspected_qty | Ratio (%) |
|---|
| Downtime minutes | Total machine downtime minutes recorded in the period, for every reason (including changeovers and scheduled maintenance). | Number |
|---|
| First pass yield (FPY) | Good output divided by total output. The quality component of OEE.= Good output / Total output | Ratio (%) |
|---|
| OEE (overall equipment effectiveness) | Availability x performance x first pass yield, computed on the period totals.= (mfg_run_minutes / mfg_planned_minutes) * (Total output / mfg_ideal_output) * (Good output / Total output) | Ratio (%) |
|---|
| On-time completion rate | Work orders completed on time divided by work orders completed in the period.= mfg_on_time_work_orders / Completed work orders | Ratio (%) |
|---|
| Good output | Good units (total output minus scrap) produced in the period's shifts, by shift date. | Count |
|---|
| Output value | Good output multiplied by the item's standard selling price, by machine shift date. | Currency |
|---|
| Performance | Total output divided by the ideal output for the run time. The second component of OEE.= Total output / mfg_ideal_output | Ratio (%) |
|---|
| Total output | Total units produced in the period's shifts, including both good units and scrap. | Count |
|---|
| Scrap rate | Scrap units (total output minus good output) divided by total output.= (Total output - Good output) / Total output | Ratio (%) |
|---|
| Unplanned downtime share | Unplanned downtime minutes divided by total downtime minutes.= mfg_unplanned_downtime_minutes / Downtime minutes | Ratio (%) |
|---|