| Output share on late-data days | Output of machine shifts falling on days whose data missed the freshness commitment divided by total output in the same period. Shows how much of the production figures on the KPI board arrived late or were incomplete when viewed.= Output recorded on late-data days / Total output | Ratio (%) |
|---|
| Output recorded on late-data days | Total output (including scrap) of machine shifts falling on days with at least one data load later than the freshness commitment. Figures for these days may have been viewed while incomplete and should be rechecked. | Count |
|---|
| Departments viewing dashboards | Number of distinct departments with at least one dashboard view in the period. | Count |
|---|
| Average request lead time (days) | Average days from when a department submits a request to when the data team delivers it, for requests delivered in the period.= da_request_lead_days_total / Delivered requests | Number |
|---|
| Average run duration (minutes) | Average minutes from start to finish of successful runs in the period.= da_run_minutes_total / da_successful_runs | Number |
|---|
| Check pass rate | Passed checks divided by all data quality checks in the period.= (Data quality checks - Failed checks) / Data quality checks | Ratio (%) |
|---|
| Dashboard views | Total dashboard views by users across departments in the period. | Count |
|---|
| Delivered requests | Delivered requests with a delivery date in the period (by delivery date). | Count |
|---|
| Failed checks | Data quality checks with a standardized result of fail in the period. | Count |
|---|
| Failed runs | Pipeline runs with a standardized status of failed (including errors and timeouts), by start date. | Count |
|---|
| Freshness breaches | Successful runs where the gap since the previous successful load of the same table exceeds that table's freshness commitment (freshness_sla_hours). | Count |
|---|
| Pipeline runs | Data loading pipeline runs started in the period, including successful, failed and skipped runs. | Count |
|---|
| Data quality checks | Data quality checks run in the period (freshness, completeness, uniqueness, validity). | Count |
|---|
| Analysis requests | Analysis and report requests that departments submitted to the data team in the period (by submission date). | Count |
|---|
| Run success rate | Successful runs divided by runs with an outcome (successful plus failed). Skipped runs are excluded.= da_successful_runs / (da_successful_runs + Failed runs) | Ratio (%) |
|---|
| Availability | Run minutes divided by planned minutes. The first component of OEE.= mfg_run_minutes / mfg_planned_minutes | Ratio (%) |
|---|
| Completed work orders | Work orders completed in the period, by completion date. | Count |
|---|
| Inspection defect rate | Defective samples divided by inspected samples across the inspection lots in the period.= mfg_defect_qty / mfg_inspected_qty | Ratio (%) |
|---|
| Downtime minutes | Total machine downtime minutes recorded in the period, for every reason (including changeovers and scheduled maintenance). | Number |
|---|
| First pass yield (FPY) | Good output divided by total output. The quality component of OEE.= Good output / Total output | Ratio (%) |
|---|
| OEE (overall equipment effectiveness) | Availability x performance x first pass yield, computed on the period totals.= (mfg_run_minutes / mfg_planned_minutes) * (Total output / mfg_ideal_output) * (Good output / Total output) | Ratio (%) |
|---|
| On-time completion rate | Work orders completed on time divided by work orders completed in the period.= mfg_on_time_work_orders / Completed work orders | Ratio (%) |
|---|
| Good output | Good units (total output minus scrap) produced in the period's shifts, by shift date. | Count |
|---|
| Output value | Good output multiplied by the item's standard selling price, by machine shift date. | Currency |
|---|
| Performance | Total output divided by the ideal output for the run time. The second component of OEE.= Total output / mfg_ideal_output | Ratio (%) |
|---|
| Total output | Total units produced in the period's shifts, including both good units and scrap. | Count |
|---|
| Scrap rate | Scrap units (total output minus good output) divided by total output.= (Total output - Good output) / Total output | Ratio (%) |
|---|